Beloyarsk Nuclear Power Station: Difference between revisions

Unit 4 is operational and added BN1200 as planned
(update param)
(Unit 4 is operational and added BN1200 as planned)
| np_cooling_source = [[Pyshma River]]
| np_cooling_towers =
| ps_units_operational = 1 × 600&nbsp;[[Megawatt|MW]]<br>1 × 880&nbsp;[[Megawatt|MW]]
| ps_units_decommissioned = 1 × 108&nbsp;[[Megawatt|MW]]<br>1 × 160&nbsp;[[Megawatt|MW]]
| ps_units_uc = 1 × 880&nbsp;[[Megawatt|MW]]
| ps_units_planned = 1 × 1220&nbsp;[[Megawatt|MW]]
| ps_electrical_capacity = 1,480
| ps_annual_generation = 10,100